Hydroelectric power Tsinjoarivo - Madagascar

The Firm is working on the design of a hydroelectric plant that foresees the exploitation of the waters of the Onive river in Madagascar.

MAIN FEATURES:
Catchment area                                    3.281,5 kmq
Derived average flow rate                   54,50 mc/s
Maximum flow rate                               110,00 mc/s
Installed power                                      44.250 kW

20/12/2019
Go Back to the list