Ankelimahery Renewable Plant (Mahitsy II)

The firm was involved in the feasibility study of a system of hydroelectric + solar renewable energy plants in the immediate vicinity of the Farahantsana Mahitsy hydroelectric plant.

The project involves the construction of a run-of-river hydroelectric plant with an installed power of 13.4 MW, and two photovoltaic plants each with 5 MW of installed power. The energy produced will be delivered via a 35 kV power line to the new Farahantsana Mahitsy substation, and evacuated to the national grid.