HV Transmission line - Antananarivo, MADAGASCAR
The firm contributed to the implementation of the project for the evacuation of energy produced by the Farahantsana – Mahitsy power plant towards the Antananarivo South substation, which was completed in 2022. The length of the power line is 36 km and is rated at 132 kV, with 160 pylons with different structural and dimensional typologies

The line touches ten municipalities and two regions and has required careful management of environmental and social aspects, the management of relationships between communities, authorities and subcontractors.