Tsinjoarivo Hydropower Plant - MADAGASCAR

The firm worked on the design of a new hydroelectric power plant with an installed capacity of 43 MW which involves the use of the waters of the Onive river, in the central part of Madagascar, taking care of the preliminary and definitive phases, as well as the management of consultants in the field of cadastral, environmental, social and geotechnical-geophysical studies.

The study also supported the preliminary study of the evacuation line between the site of Tsinjoarivo and the national grid (132 kV high voltage).