Hydroelectric power Tsinjoarivo - Madagascar

The Firm is working on the design of a hydroelectric plant that foresees
the exploitation of the waters of the Onive river in Madagascar.
MAIN FEATURES:
Catchment area 3.281,5 kmq
Derived average flow rate 54,50 mc/s
Maximum flow rate 110,00 mc/s
Installed power 44.250 kW